Leister COMET Manual De Instrucciones página 30

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 48
Adjustment of the hot wedge and the guide roller
— Adjustment of the rear guide roller (19)
H
Slacken the hexagon socket screw (32).
Insert the material to be welded. Adjust the welding pressure (see Page 23).
I
Engage the hot wedge (7).
K
H
32
— Adjusting the hot wedge with two heating cartridges
The front guide roller (18) and rear guide roller (19) must form a straight line with the pressure
M
roller (20), whereby the rear guide roller (19) is adjusted to approximately 2 mm under the line.
Tighten the hexagon socket screw (32).
H
roller) must be held at the same time with an Allen key.
M
18
19
— Adjusting the hot wedge with three or four heating cartridges
Turn the rear guide roller (19) clockwise against the film. While doing so, the rear guide roller (19) must
O
contact the film and there must be a noticeable resistance to turning.
Tighten the hexagon socket screw (32).
H
roller) must be held at the same time with an Allen key.
O
34
19
Slacken the lever locking mechanism (12) and at the same time
P
release the lever for welding pressure (9). Remove the test material.
P
30
Tension the clamping arm (31) using the lever for welding pressure (9).
L
I
20
34
2 mm
H
32
20
9
12
K
19
7
The hexagon socket screw (34) (on the front face of the guide
M
H
32
The hexagon socket screw (34) (on the front face of the guide
O
L
9
31

Publicidad

Tabla de contenido
loading

Tabla de contenido