Promax AE-966 Manual De Instrucciones página 314

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

USER'S MANUAL AE-966 / 967
Check GPIB
1.- To check the GPIB installation status,
installation
press the System key.
status
2.- Press F6 (More).
3.- Press F4 (System Config On).
4.-
appears. When the GPIB module is
installed correctly, the check box is
marked.
Check GPIB
1.-
self-test result
functionality result, press the System key.
2.- Press F6 (More).
3.- Press F2 (Self Test).
4.- The GPIB result appears at F1. If the
result is Fail (underlined), contact service
personnel
GPIB
Keep these rules when using GPIB interface.
constraints
- Altogether less than 15 devices & 20m cable length, 2m between
each device on the bus
- Unique address assigned for each device
- At least 2/3 of the GPIB devices turned On
- No loop or parallel structure allowed
04/2016
The system configuration window
To
check
the
internal
System
More...
System Config
On
Off
Installed
Uninstalled
GPIB
System
More...
Self Test...
GPIB
Pass Fail
Page 123
F 6
F 4
F 6
F 2
F 1

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ae-967

Tabla de contenido