2. Preparation

2.1
GB
Note!
Measuring
Levelling
Measuring out
Drilling
Tightning
Manual operation
Shortening
2.2

Preliminary remarks:

Do not trail the top roller over the ground
During the installation, place the top
roller on a clean surface
2.3
The NovoSpeed Alu S consists of the following main sections:
A top roller that consists of a door roller surrounded by a plastic door panel (cloth).
Two columns that support the top roller and guide the door panel.
A cabinet with the control box.
A box with further small parts.
When installing multiple doors you must carefully sort all components!
Report any transport damage immediately to Novoferm Netherlands BV.
+ Note! +++ Note! +++ Note! +++ Note! +++ Note! +++ Note! +++ Note! +++ Note! +++ Note! +
4
Forklift truck
Lubricating
Cutting
Reading
Clips
Safety helmet
Ty-Rap
, etc. Installation sequence
➀➁➂
Do not step on the cloth!
The following instructions apply to
standard NovoSpeed Alu S doors
2.4
?
BOX
1 ### ###
2 ##### #
3 #### ##
4 ### ###
5 #### ##
6 ### ###
Ensure that the correct parts have
been supplied. When installing
multiple doors make sure to sort
everything carefully!
2.6
B1
B2
B3
B1 = B2 = B3?
Check the breadth
of the standard opening.
2.8
OK?
Check that lintel
a n d post s a re
straight and level.
2.5
Make sure that the work area is
adequately cordoned off.
2.7
H1
H2
H3
200
200
v
v
H1 = H2 = H3?
Check the height
of the standard opening.
2.9
HL = HR?
HR
HL
Check that the
floor within the
range of the door
smooth and level.
GB
5