Installation Of The Motor; Positioning Of The Motor - V2 ALFARISS Manual De Instrucciones

Ocultar thumbs Ver también para ALFARISS:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3 - INSTALLATION OF THE MOTOR

3.1 - POSITIONING OF THE MOTOR

To fix ALFARISS, follow the instructions below:
1. use the measurements indicated in the drawing for the
foundations
2. Arrange for one or two pipes for the passage of electric
cables
3. Assemble the 2 clamps on the anchoring plate and fix them
with the 4 bolts issued with the motor
4. Pour the concrete and position the anchoring plate
WARNING: check that the plate be on a perfectly
levelled surface and parallel to the gate
5. Wait for the complete setting of the concrete
6. Unscrew the bolts fixing the base to the clamps and put the
motor on the plate
7. Insert the 4 grains with their nuts in the proper place.
Adjust the 4 grains to make the motor be perfectly levelled
8. Control that the motor is perfectly parallel to the gate, then
insert the 2 washers R and lightly screw the 2 bolts D
WARNING: put the washer G into the hole for the passing of
the cables as shown in the picture. Pierce the washer to let the
cable to be connected to the control unit pass, paying attention
to the dimensions in order to avoid the entrance of insects and
other small animals.

Publicidad

Tabla de contenido
loading

Tabla de contenido