Installing The Effective Load - Festo EGC-BS-KF Instrucciones De Utilizacion

Eje de accionamiento por husillo
Ocultar thumbs Ver también para EGC-BS-KF:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
EGC-BS-KF, EGC-HD-BS
5.1.2

Installing the effective load

• Position the effective load in such a way that the tilting torque
resulting from force F (parallel to the axis of motion) and lever
arm "a" remains low.
• Affix the effective load to the slide with the screws and centring
sleeves.
• Make sure that the maximum screw-in depth D is adhered to.
Size
Screw (side/top)
Max. screw-in depth D
Centring (H7)
Tightening torque
Tab. 3
Effective loads with own guide:
• Adjust the guides of the effective load and of the EGC so that they are exactly parallel.
This avoids overloading of the guide and increased wear.
Hard and rigid effective loads (e.g. steel):
Note
If the aluminium slide is bent against a curved effect­
ive load, the service life of the guide will be reduced.
• Make sure that the mounting surface of the effect­
ive loads is flat to within t = 0.01 mm.
If additional slides are used, possible differences in
height must be compensated for.
Effective loads projecting in the direction of slide movement:
• Make sure that the effective load does not strike against the
motor.
Festo – EGC-BS-KF, EGC-HD-BS – 1505e English
70
80
M5
M5/M6
[mm]
8.4
9.5
5
7/9
[mm]
[Nm]
5.9
5.9/9.9
a
Fig. 6
Fig. 7
120
125
160
M5
M6
10
8.4
9.5
5/9 9
5.9
9.9
Fig. 8
Fig. 9
F
185
220
M6/M8
M6
15
10
9
9
9.9/24
9.9
t
27

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Egc-hd-bs

Tabla de contenido