Sime MURELLE EV Serie Manual Del Usuario página 109

Ocultar thumbs Ver también para MURELLE EV Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.4
MAINTENANCE
To guarantee functioning and efficiency of
the appliance, in respect of the legal provi-
sions in force, it must be regularly checked;
the frequency of the checks depends on
the type of appliance and the installation
and usage conditions.
In any case, it should be inspected at least
once a year by a qualified technician.
Carry out the cleaning of the generator in
the following way:
– Turn the main switch off to stop electric
power reaching the boiler and close the
gas feed cock.
– Remove the outer casing and the gas
burner manifold unit. To clean the burner,
blow in a jet of air, so as to remove any
dust particles that may have accumula-
ted.
– Clean the heat exchanger, removing any
dust or residue from combustion. When
cleaning the heat exchanger or the bur-
ners, chemical products or steel bru-
shes MUST NOT BE USED.
Make sure that the tops of the burners
with the holes are free from encrusta-
tions.
– Reassemble the items removed from
the boiler, making sure to follow the cor-
rect sequence.
– Check operation of the main burner.
– After assembly of all the gas connec-
tions, these must be tested for sound-
ness, using soapy water or appropriate
products. DO NOT USE NAKED FLAMES.
– Do not use calcium chloride to treat the
plastic component during generator
maintenance.
4.4. 1
Chimney sweep function (fig. 22)
To check boiler combustion, press the
installer's key
for a few seconds.
The chimney sweep function will switch on
and will continue for 15 minutes. From that
moment, the boiler will start working in
heating mode at maximum power, with cut
off at 80°C and re-ignition at 70°C.
Fig. 22
Before activating the chimney sweep func-
tion make sure that the radiator valves or
eventual zone valves are open.
The test can also be carried out with the
boiler working in D.H.W. mode.
For this, after activating the chimney sweep
function, open one or more hot water fau-
cets. Under these conditions, the boiler will
function at maximum power with the
D.H.W. kept at between 60°C and 50°C.
During the test, the hot water faucets
must remain open.
If the key
and
are pressed during
the 15 minutes of the chimney sweep func-
tion, the boiler will be brought respectively
to maximum and minimum power.
The chimney sweep function will automa-
tically switch off after 15 minutes or
is pressed again.
when the key
4.4.2
Cleaning the filter "Aqua Guard
Filter System" (fig. 23)
To clean the filter, close the delivery/return
on/off taps, turn off the power to the con-
trol panel, remove the casing and empty the
boiler using the drain provided.
Place a container for collection underneath
the filter, unscrew the cap and proceed to
clean the filter, removing impurities and
limestone deposits.
Check the seal o-ring before reassembling
the cap with the filter.
4.4.3
Operation floor drying (fig. 23/a)
The operation floor drying keeps the floor
at a pre-established temperature profile
and it is activated only for those systems
combined with the mixed zone card ZONA
MIX code 8092234. The temperature pro-
files can be selected by means of the instal-
ler parameter PAR 43:
[TVw]
55
50
45
40
35
30
25
20
0
1
5
7
1
X
A
1
TVw
Flow temperature setpoint
Tag
Period in days
x
Start day
A
Functional heating
B
Floor curing heating
0 = Not activated function
1 = Curve setting A
2 = Curve setting B
3 = Curve setting A + B
The turning off of the function happens
clicking on the button OFF (return of PAR
43 to the value 0) or automatically at the
end of the function.
The set of the mixed zone follows the deve-
lopment of the selected curve and reaches
a maximum of 55°C. During the function all
the other heating demands are ignored
(heating, sanitary, antifreeze and chimney
sweep).
During the functioning the display shows
the remaining days for the completion of
the function (example mains digits -15 = 15
days lack to the end of the function). The
diagram fig. 23/a reports the development
of the curve.
ATTENTION:
- Observe the relevant standards and
regulations of the floor manufacturer!
- Proper functioning is ensured only
when the plant is correctly installed
(hydraulic system, electrical installa-
tion, settings)! If not observed, the
floor might get damaged!
5
10
15
B
A + B
ES
PT
ENG
Fig. 23
18
[Tag
]
25
Fig. 23/a
109

Publicidad

Tabla de contenido
loading

Tabla de contenido