Start-Up Procedure - Hoshizaki FM-600AHE Manual De Instalación

Ocultar thumbs Ver también para FM-600AHE:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22
ENGLISH
Note: Jointing compounds should be approved
and suitable for potable water use.
2) Attach angled end of white flexible inlet hose
(accessory) to the G3/4 fitting on the rear of the
icemaker as indicated, ensuring rubber sealing
washer is correctly positioned. Hand tighten
sufficiently to provide leak free joint.
Note: On water-cooled model, make the same
connection to free end of 1/2-3/4 nipple on
the water-cooled condenser inlet.
3) Attach the other end of inlet hose(s) to the water
tap, noting washer(s) is/are correctly positioned
before hand tightening as above.
Note: If filtration or treatment is used, ensure
icemaker section only is on treated water
supply, not the condenser.
4) Attach grey flexible outlet hoses (accessories) to
the R3/4 fittings as indicated, confirming fitment
of rubber washers before finally hand tightening
the joints. These pipes can be cut to length as
necessary to suit position of main drain.
Note: On water-cooled model, make the same
connection to free end of 3/4-3/8 nipple on
the condenser outlet.
[Air-Cooled Model]
Inlet Hose
Outlet Hose
Fig. 6
[Water-Cooled Model]
1/2-3/4 Nipple
3/4-3/8 Nipple
Inlet Hose
Water Supply
Inlet G3/4
Drain Outlet
R3/4

6. START-UP PROCEDURE

1 ) C h e c k t h a t t h e p o w e r s u p p l y c o r d i s
disconnected.
2) Move the Operation Switch on the Operation
Panel to the "ON" position.
3) Open the water supply tap.
4) Connect the power supply and energise.
5) The Display will illuminate in the "ICE" mode.
6) The following should occur in sequence:
a) Water Reservoir will fill.
b) Gear Motor will start.
c) Compressor will start.
4
Water Supply
Inlet G3/4
Condenser
Inlet Rc1/2
Condenser
Outlet Rc3/8
Drain Outlet
R3/4
Outlet Hose
Fig. 7
Water Supply Tap
Inlet Hose
Fig. 8

Publicidad

Tabla de contenido
loading

Tabla de contenido