Flow Control Valve
Icemaker
Strainer
[b] Connections according to regulations other than WRC by
utilising accessory hoses (Fig. 17)
1) Follow the instructions from 1) to 4) in [a] above.
2) For Condenser connections, use supplied accessory hoses and
make the same connections as 1) to 3) in [a] above to the free end
of 1/2-3/4 nipples as indicated (Fig. 17).
Potable Water
Inlet G3/4
1/2-3/4
Nipple
Inlet Hose
Outlet Hose
7. START-UP PROCEDURE
1) Disconnect the power supply.
2) Open the water tap.
3) Connect the power supply and energise.
4) The following should occur in sequence:
a) Compressor will start (Hot Gas Valve open).
b) Water Pan will fully open.
c) Water Solenoid will open.
d) Water Pan will start to close (Hot Gas Valve closed).
e) Water Pan fully closed - Pump Motor will start.
f) Water Solenoid will close.
1. Check the conditions and quality of the ice production.
2. Do not use ice produced in the trial run. It might be contaminated
with foreign matter in the water circuit. Discard or flush
down the drain.
92E1CG20C0012
Cooling
Tower
P
Pump
Fig. 16
Icemaker
Cooling Water
Inlet Rc1/2
Cooling Water
Outlet Rc1/2
Drain Outlet R3/4
(on left side of
Storage Bin)
Bin
Fig. 17
IMPORTANT
8. FINAL CHECKS
1) Is installation free of water leaks?
2) Is the icemaker free from vibration?
3) Are all the panels fixed and secure?
4) Has the user been instructed on correct machine use and handed
the Instruction Manual?
5
ENGLISH