Start-Up Procedure; Final Checks - Hoshizaki FM-150KE Manual De Instalación

Ocultar thumbs Ver también para FM-150KE:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23

8. START-UP PROCEDURE

1) Check that the power supply cord is disconnected.
2) Move the operation switch on the operation panel to the "ON" position.
3) Open the water supply tap.
4) Connect the power supply and energise.
5) The display will illuminate in the "ICE" mode.
6) The following should occur in sequence:
a) Water reservoir will fill.
b) Gear motor will start.
c) Compressor will start.
Check the conditions and quality of the ice production.
Do not use ice produced in the trial run. It might be contaminated with foreign matter in the water circuit. Discard or flush down
the drain.
Clean the storage bin before use (see "III. 1. CLEANING" in instruction manual).

9. FINAL CHECKS

1) Check for correct supply voltage.
2) Check that the icemaker is properly earthed.
3) Check that the icemaker is free from vibration.
4) Check that all the panels are fixed and secure.
5) Check for proper operation according to "8. START-UP PROCEDURE".
6) Check the water supply and drain connections for water leaks.
7) Instruct the user on correct machine use. Hand the instruction manual to the user.
Ice Button
Maintenance Button
(service use only)
HYGIENE
5
ENGLISH
Operation Panel
Display
Stop Button
Operation Switch

Publicidad

Tabla de contenido
loading

Tabla de contenido