7. START-UP PROCEDURE

1) Check that the power supply cord is disconnected.
2) Remove the Front Panel.
3) Check the single phase supply voltage and set the
Voltage Setting Switch on the Control Box to the
nearest voltage (220V, 230V or 240V).
4) Remove the Caution Sheet and move the Operation
Switch to the "ON" position.
5) Open the water supply tap.
6) Connect the power supply and energise.
7) The Display will illuminate in the "ICE" mode.
8) The following should occur in sequence:
a) Water Reservoir will fill.
b) Gear Motor will start.
c) Compressor will start.
9) Replace the Front Panel in its correct position.
1. Check the conditions and quality of the ice
production. Change ice size if necessary (see
"II. 1. OPERATION" in Instruction Manual).
2. Do not use ice produced in the trial run. It
might be contaminated with foreign matter in
the water circuit. Discard or flush down the
drain.
3. Clean the Storage Bin before use (see "III. 1.
CLEANING" in Instruction Manual).
92E2DA20E0303
Water Supply Tap
Inlet Hose
Fig. 10
IMPORTANT
Control Box
Caution Sheet
Ice Button
Display
Option Button
Stop Button
Fig. 11

8. FINAL CHECKS

1) Is installation free of water leaks?
2) Is the icemaker free from vibration?
3) Are all the panels fixed and secure?
4) Has the user been instructed on correct machine
use and handed the Instruction Manual?
5
ENGLISH
Voltage Setting
Switch
Motor Protector
(10A)
Motor Protector
(6A)
Operation Switch