ENGLISH
* The icemaker drain is gravity flow, so ensure
drain pipe has an adequate pitch or fall.
* Water should drain into an open trap.
* Drain lines should not be piped directly to the
sewer system. A vertical air gap of a minimum
of 5 cm should be between the end of the drain
pipes from the icemaker and the storage bin and
the floor drain.
* Water supply connection is intended to be made
by means of a pipe, not a hose set.

6. START-UP PROCEDURE

1) C h e c k t h a t t h e p o w e r s u p p l y c o r d i s
disconnected.
2) Move the Operation Switch on the Operation
Panel to the "ON" position.
3) Open the water supply tap.
4) Connect the power supply and energise.
5) The Display will illuminate in the "ICE" mode.
6) The following should occur in sequence:
a) Water Reservoir will fill.
b) Gear Motor will start.
c) Compressor will start.
Operation Panel
Ice Button Display Stop Button
Maintenance Button
(service use only)
Fig. 7
IMPORTANT
1. Check the conditions and quality of the ice
production.

7. FINAL CHECKS

1) Is installation free of water leaks?
2) Is the icemaker free from vibration?
3) Are all the panels fixed and secure?
4) Has the user been instructed on correct machine
Operation Switch
4
2. Do not use ice produced in the trial run. It
might be contaminated with foreign matter
in the water circuit. Discard or flush down
the drain.
3. Clean the Storage Bin before use (see "III.
1. CLEANING" in Instruction Manual).
use and handed the Instruction Manual?