PROHEAT II SERIES · AIR/WATER SYSTEM
IS VERY IMPORTANT TO KEEP THE PACKAGED EQUIPMENT UPRIGHT, THE PACKAGING HAS
BEEN SPECIFICALLY DESIGNED FOR THIS. ALWAYS MAINTAIN IT IN A VERTICAL POSITION.
IF THE UNIT IS DAMAGED, OR THE DELIVERY IS INCOMPLETE, MAKE A NOTE OF IT ON THE CARRIER'S BILL AND
IMMEDIATELY MAKE A CLAIM TO THE COMPANY IN CHARGE OF DELIVERY.
Inside the parcel you will find the following elements:
Pool heating equipment
Installation manual.
Warranty.
9. OPERATING CONDITIONS
Water physical and chemical parameters must be in between:
PH..........................................
Residual chlorine........................
Alkalinity...............................
Total dissolved solids............. </=3000 mg/l
Hardness...............................
The limits established for working conditions in order to guarantee the proper operation of the
equipment are:
Minimum outside temperature for standard PROHEAT: 0ºC
Maximum pool water temperature:
Maximum intake water pressure:
The operating conditions will affect the output of the equipment.
10.
PRELIMINARY REQUIREMENTS AND PROCEDURES
•
Make sure that the location intended for the equipment can withstand the weight of
the equipment.
•
The unit should be placed on a bench for better distribution of weight, as
recommended by the designer.
•
The machine should always be place vertically and balanced.
•
This machine is intended to operate outdoors.
•
An area around the equipment should be kept clear for use during maintenance and
operation and the air intake and outlet should be kept clear (see illustration).
© FLUIDRA 2016 ALL RIGHTS RESERVED. PROPRIETARY DOCUMENT.
ENGLISH
7.2 to 7.8
1 to 2 ppm
80 to 125 ppm
200 – 300 ppm
40ºC
3.5 bar
Pag: 35