Switch Replacement - ESAB Gun Master 400 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

sectIon 4

4.3 SWITCH REPLACEMENT

step #1
Push switch lead connectors firmly onto switch terminals with
needle nose pliers.
Depress switch plunger and nest back into housing.
fit switch housing into nest on handle (switch leads must lie
parallel).
Align housing holes with threaded holes in body and insert
mounting screws.
Start both screws first before tightening with 8-mm nut driver
to even alignment.
Important:
use manufacturers screws to ensure proper length, hardness and
tolerance.
4.4 GOOSE REPLACEMENT
step #1
Place gooseneck in vise.
remove both switch housing mounting screws.
Slide handle back exposing the cable connection.
loosen the cable / gooseneck connection using a
11/16" (17mm) wrench.
remove from vise and unthread gooseneck by
hand.
noTe: The body is now an integral part of the goose-
neck and the handle mounting holes are metric (M5).
use the screws supplied with the new neck to avoid
stripping of threads.
step #2
Thread the gooseneck into the cable connection (hand tight-
en).
Place gooseneck in vise and tighten with a wrench to within
1/8" (. mm) spacing between the cable connection and
gooseneck body.
SWiTch
SWiTch houSing
MounTing ScreWS
gooSenecK
7
maIntenance
leADS
SWiTch houSing
SWiTch
hAnDle
1/8" (. m)

Publicidad

Tabla de contenido
loading

Tabla de contenido