Verify Engine Oil Level

The generator engine is shipped from the factory filled
with oil (API SJ or higher 10W-30). This allows for
generator operation in the widest range of temperature
and climate conditions. Before starting the engine,
check oil level and ensure that engine is serviced as
described in Maintenance.
NOTICE Any attempt to crank or start the engine
before it has been properly filled with the recommended
oil could result in equipment failure.
• Refer to Maintenance for oil fill information.
• Damage to equipment resulting from failure to follow this
instruction will void warranty.
NOTICE See Oil in the Maintenance section to review
oil recomendations. Verify provided oil in engine is the
correct viscosity for current ambient temperature.
Add Fuel
Fuel must meet these requirements:
• Clean, fresh, unleaded gasoline.
• A minimum of 87 octane/87 AKI (91 RON). For
high altitude use, see High Altitude.
• Gasoline with up to 10% ethanol (gasohol) is
acceptable.
NOTICE Use of unapproved fuels could damage
generator and voids warranty.
• DO NOT use unapproved gasoline such as E15 and E85.
• DO NOT mix oil in gasoline or modify engine to run on
alternate fuels.
To protect the fuel system from gum formation, mix
in a fuel stabilizer when adding fuel. See Storage.
All fuel is not the same. If you experience starting or
performance problems after using fuel, switch to a
different fuel provider or change brands. This engine is
certified to operate on gasoline. The emission control
system for this engine is EM (Engine Modifications).
WARNING Fuel and its vapors are extremely
flammable and explosive which could
cause burns, fire or explosion
resulting in death or serious injury.
WHEN ADDING FUEL
• Turn generator engine OFF and let it cool at least 2 minutes
before removing fuel cap. Loosen cap slowly to relieve
pressure in tank.
• Fill fuel tank outdoors.
• DO NOT overfill tank. Allow space for fuel expansion.
• If fuel spills, wait until it evaporates before starting engine.
• Keep fuel away from sparks, open flames, pilot lights,
heat, and other ignition sources.
• Check fuel lines, tank, cap and fittings frequently for
cracks or leaks. Replace if necessary.
• DO NOT light a cigarette or smoke.
10
1. Clean area around fuel fill cap, remove cap.
2. Slowly add unleaded gasoline (A) to fuel tank (B).
Be careful not to fill above the baffle (C). This allows
adequate space for fuel expansion as shown.
C
3. Install fuel cap and let any spilled fuel evaporate
before starting engine.
High Altitude
At altitudes over 5,000 ft. (1524 m), a minimum
85 octane / 85 AKI (89 RON) gasoline is acceptable.
To remain emissions compliant, high altitude
adjustment is required. Operation without this
adjustment will cause decreased performance,
increased fuel consumption, and increased emissions.
See an authorized dealer for high altitude adjustment
information. Operation of the engine at altitudes
below 2,500 ft. (762 m) with the high altitude kit is not
recommended.

System Ground

The generator has a system ground that connects the
generator frame components to the ground terminals
on the AC output receptacles. The system ground is
connected to the AC neutral wire (the neutral is bonded
to the generator frame).
Special Requirements
There may be Federal or State Occupational Safety
and Health Administration (OSHA) regulations, local
codes, or ordinances that apply to the intended use of
the generator. Please consult a qualified electrician,
electrical inspector, or the local agency having
jurisdiction:
• In some areas, generators are required to be
registered with local utility companies.
• If the generator is used at a construction site,
there may be additional regulations which must be
observed.

Connecting to a Building's Electrical System

Connections for standby power to a building's electrical
system must use a listed transfer switch installed by
a current licensed electrician. The connection must
isolate the generator power from the utility power and
must comply with all applicable laws and electrical
codes.
BRIGGSandSTRATTON.COM
B
TANK
A
FUEL

Publicidad