OPERATING INSTRUCTIONS
4.2
Installation preparations / Concrete pool
fig. 9
A
Polystyrene filler piece
C
Mounting protection film
D
Pool-side formwork board
Tailor the installation kit:
Place the installation kit on the formwork board and transfer the bore holes. Bore the holes
into the pool-side formwork board (D).
Screw the installation kit complete with the mounting protection film (C) tightly to the pool-
side formwork board (D).
After removing the shuttering take off the polystyrene filler piece (A). Also remove the
protection film (C).
4.3
Installation preparations / Pre-fabricated pool
fig. 11: Boring diagram
C2 rondo
Version: 27200 - D
8424
fig. 10
P
20
Tailor the installation kit:
Cut the cavity Ø 205 and the mounting
holes Ø 9 into the pool wall.
Warning! Risk of damage!
The hold-ring (62) must be used as a
template.
For rear filling the pool ensure that there
is a cavity at least the size of the dotted
lines.
8308
Schmalenberger GmbH + Co. KG
D-72072 Tübingen / Germany
Formwork board
Installation kit
8425
51