Operating condition

• Before putting into operation, check power supply cord (1), Power supply cord coupling (2) and
connector as well as extension cable for electrical and mechanical damage
• Assemble pressure roller, nozzle, handle and supporting carrier as required.
• Assembling accessories
– Push handle (15) onto drive unit (5) up to the required setting. Fix handle (15) by
turning clockwise.
– Assemble double supporting carrier (8) or single supporting carrier (9) onto drive unit (5) using the four
fixing screws for supporting carrier (10).
– Assemble pressure roller (11) using fixing screw (12).
– Push hot air blower, TRIAC AT or TRIAC ST (13) into holder for hot air blower (6). The hot air blower must
be pushed in so that the distance between the end of the protective tube and holder for hot air blower (6) is
10 mm (see Detail A).
– Tighten fixing screw (14).
– Push on overlap welding nozzle (16).
• Adjusting supporting carrier to the material thickness (Detail B).
– Loosen the four fixing screws for supporting carrier (10).
– Feed in a small section of the material to be welded between drive unit (5) and double supporting carrier (8)
or single supporting carrier (9).
– Move double supporting carrier (8) or single supporting carrier (9) up to the material to be welded.
– Tighten the four fixing screws for supporting carrier (10).
– Remove the material to be welded.
– Check the previous setting (see Detail C).
• Adjusting overlap welding nozzle (Detail D).
– Line up overlap welding nozzle (16) parallel to the pressure roller (11).
– Tighten fixing screw for overlap welding nozzle (17).
– Loosen the adjusting screws for holder (7).
– Line up the overlap welding nozzle (16) parallel to the material to be welded by moving the hot air blower
(13) (Detail F). In order to avoid welding problems, the double supporting carrier (8) or single supporting
carrier (9) and the pressure roller must be positioned together with the material being welded.
– Tighten adjusting screws for holder (7).
Detail A
14
6
Protection tube end
14
Detail B
Material to
be welded
10
11
8
Detail C
5
8
Material to be welded
Leister DRIVE
Detail D
11
16
11

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido