3-Wall Alcove Installation - Jacuzzi SOAKER Serie Instrucciones Para La Instalación Y El Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Soaker™ Bath Series
Drop-in Installation (con't)
Inspect all fittings, plumbing, and control
8
lines after inserting the bathtub to insure the
components are not damaged, disconnected, or
contacting the finish surface substrate or support
members (Figure 9).
Connect flex water supply lines to faucet and plug
9
power cords into GFCI outlet.
Remove scrap lumber and lower the bathtub fully
10
into the opening (Figures 10 and 11).
The bathtub must be fully supported from the
bottom. The bathtub must rest on the subfloor, or
be in contact with the leveling material.
Align the bathtub and connect the drain.
11
Turn on the power supply to the dedicated GFCI
12
protected circuits and check system operation.
Caulk around the perimeter of bathtub to seal the
13
space between the rim and the finished deck.

3-Wall Alcove Installation

Install the drain/overflow according to the
1
manufacturer's instructions. Refer also to the
Technical Specifications Manual.
Watertight installation of the drain is the installer's
responsibility. Drain leakage is excluded from the
Jacuzzi Luxury Bath warranty of this product.
Install the faucet at this time. It is recommended that
2
the faucet be installed by a qualified plumber.
Install the flange (purchased separately) according
3
to the instructions that are included with the kit. If the
bathtub is equipped with an integrated flange, skip this
step.
Place the bathtub into the niche. Screw the flange to
4
the wood stud. It may be necessary to shim the unit
to close up any gaps between the wood stud and the
flange (Figure 12).
Insulation may be placed within the bathtub surround.
5
Turn off the power supply to the GFCI protected
6
circuit.
Align the bathtub and connect the drain.
7
Connect flex water supply lines to faucet and plug
8
power cords into GFCI outlet.
Inspect all fittings, plumbing, and control lines after
9
inserting the bathtub to insure the components are
not damaged, disconnected, or contacting the finish
surface substrate or support members.
Turn on the power supply to the dedicated GFCI
10
protected circuits and check system operation.
Complete all finish work around the perimeter of
11
bathtub to seal the space between the rim and the
finished deck
(Figure 13).
Installation and Operation
Level Subfloor
Figure 9 - Drop-In (side view)
Level Subfloor
Uneven
Subfloor
Screw
Figure 12 - Support
Figure 13 - Finishing
www.jacuzzi.com
Scrap Lumber
Minimum 2˝
(50mm) Max
Substrate
Thickness
Figure 10 - Support
Figure 11 - Support
Tile Flange
Tile or
Finished
Surface
Member
Support
Floating
Floor
Compound
Cement Board
Mortar
Finishing
Material
Plastic Filler
Silicon/Sealant
Bath Rim
Stud Wall
1˝ x 4˝ (not for
support)
Tile
Stud Wall
Cement Board
Tile Adhesive
Caulking
Mounting
Screw
Tile Flange
Stud
1˝ x 4˝
(not for
support)
Page 11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pure air serie

Tabla de contenido