UNPACKING
• This luminaire has been properly packed so that no
parts should have been damaged during transit.
• Inspect to confirm.
2
HANDLING
• Damage may occur if luminaire is improperly handled
outside of pack.
• Do not impact or stack luminaire after removal from
packaging.
3
MOUNTING
Risk of injury or damage. Unit will fall if not installed
properly. Follow installation instructions.
3a. PRE-INSTALLATION
The E2SA luminaire unit pack mounts on a round wood
pole. Install the mounting arm first. Drill a clearance
hole for a 5/8-inch diameter bolt through the pole. Insert
the 10-inch bolt through pole and loosely fasten with
the 2-inch square washer and nut. Hook the arm's
pole plate on the bolt head in the upper slot of the
arm plate. (See Figure 1)
Top Housing Assy
Arm
LE W/O Refractor
LE W/ Refractor
WARNING
Thru Bolt
Lag Bolts
Figure 1
3b. INSTALLATION
Tighten nut to secure mounting arm to pole. Insert lag
bolts in outer lower holes of mounting arm. Hammer
in lag bolts to approximately 1" of head then tighten
with wrench. Insert leads in arm entering at outboard
end and exiting at end adjacent to pole plate. Create a
drip loop with leads as shown.
Slipfitter clamp is factory installed for a 1 1/4 inch pipe.
If using a 2" pipe remove, invert, and refasten the
slipfitter clamp to the housing. Open fixture mounting
slipfitter clamp enough to insert mounting arm. Slide
fixture onto arm until resting on pipe stop. Lightly
tighten slipfitter bolts. Level housing front-to-back using
steps on pipe stop and right-to-left by twisting housing
on pipe. Tighten clamp bolts to 10-15 foot-pounds.
3c. PHOTOELECTRIC CONTROL
• When used, photoelectric (PE) receptacle should be
oriented so that the word "North" is directed toward
true north.
• Seat the PE control in the receptacle, Lift and rotate them
clockwise until word "North" is directed toward true north.
• Lower the PE control and receptacle to firmly seat them
into position.
• Alternatively, PE receptacle can be oriented by lifting up on
rim of the PE receptacle and rotating it until the word
"North" is directed toward true north.
• Lower PE receptacle to firmly seat it in this position.
Then install PE control.
Nuts
Square Washer
Figure 2