4
WIRING
NOTE: Make all electrical connections in accordance with
the National Electrical Code and any applicable local code
requirements including grounding.
NOTE: Verify that supply voltage is correct by comparing
it to nameplate.
Risk of Burn: Allow light engine/fixture to cool before handling.
• Open fixture by unlocking two latches. Keep one
latch hooked onto the housing ear to suspend the
light engine.
UL Units:
• Terminals are readily accessible on terminal board
and will accept service leads ranging in size from
AWG No. 16 through No. 6.
• Service leads (See fixture labeling for supply wire
temperature rating) should extend through mounting
bracket approximately 7 inches.
• Attach service leads to terminal board as shown on
luminaire nameplate.
• See table below for screw torques (See Table 1).
• A wiring diagram is provided on a label in luminaire.
TABLE 1.
Terminal Board Torque Table UL Units:
Wire Range Copper
10-16
8-6 SOL,STR
Terminal Board Connections:
Terminal Board Positions
L1
G
N/L2
(See Figure 3.)
CAUTION
Aluminum
Torque (in lbs)
STR6,SOL,STR
Supply Type
High Line
Ground
Line/Neutral
• Rotate the light engine into position and secure by
snapping two latches on light engine to "ears" on
hood. (See Figure 4)
30
45
Tether
Figure 3
Ear
Figure 4
Latch
Wire