Snap-On CENTER POST Manual De Instrucciones página 74

Desmontador automático de neumáticos
Tabla de contenido

Publicidad

74
ii-1
ii-2
ii-3
Installation Instructions
ii. Carriage instructions –
Unpacking instructions - Moving
the machine
Carriage instructions
The machine is crated in a corrugated box of
appropriate strength. The box is mounted on a pallet.
Handling of the packed machine must be made with
an appropriate lifting device (fork lift - Fig. ii-1). The
machine can be alternatively mounted on the pallet with
the column assembled. In such a case the machine
must be anchored to the transportation vehicle with a
belt of appropriate strength rolled around the column
(Fig. ii-2).
Unpacking instructions
Unpack the machine paying attention when cutting the
plastic straps or during any other operation which may
be hazardous. After removing the box check for any
visible damage to the machine and its components. In
case of doubt call qualifi ed personnel for assistance.
The packing materials (plastic bags, foam polystyrene,
nails, screws, wood etc.) must be properly disposed of.
Place the above-mentioned materials into a trash
container and dispose of according to the local
regulations.
ALWAYS WEAR GLOVES WHEN UNPACKING
THE MACHINE TO PREVENT SCRATCHES OR
ABRASIONS DUE TO CONTACT WITH PACKING
MATERIALS.
Moving the machine
In case the machine is to be moved from one working
place to another, proceed as follows:
Disconnect the machine from the air and electric
supply.
Remove from top of the machine all objects that may
fall upon handling and create hazard.
Screw the eyebolts in the correct positions as indicated
in Fig. ii-3.
Sling the machine as shown in (Fig. ii-3). Use belts with
a length of mm 3000 and a capacity of kg 500. Do not
use metal ropes to lift the machine.
As soon as handling operations are completed, remove
the eyebolts.

Publicidad

Tabla de contenido
loading

Tabla de contenido