Pneumatic Connection - Snap-On CENTER POST Manual De Instrucciones

Desmontador automático de neumáticos
Tabla de contenido

Publicidad

78
1
2
3
Installation Instructions

Pneumatic connection

THE PNEUMATIC CONNECTION MUST BE
PERFORMED ONLY BY SKILLED PERSONNEL.
The machine requires an air pressure of 8 to 12 bar
(110-170 psi), as marked on the plate of the machine
and on a sticker attached to the cabinet next to the
air inlet.
Ensure that the line pressure is within the limits
required by the machine.
If the air pressure is lower than the minimum required
level of 8 bar (110psi) the clamping power of the wheel
support and the bead breaker force may be insuffi cient
for certain tyres.
If the air pressure exceeds 12 bar (170 psi) it is
mandatory to install a pressure regulator before the
air inlet of the machine.
It is recommended that the air supply line be equipped
with a water separator to reduce the amount of water
at the air inlet.
BEFORE CONNECTING THE MACHINE TO THE AIR
SUPPLY BE SURE THAT NOTHING IS LEFT ON
THE WHEEL SUPPORT AREA (TOOLS, ETC).
After ensuring all the above proceed as follows:
Connect the machine to the air supply (max. pressure
of 12 bar (170 psi) with a rubber hose (rated for the
pressure) with an internal diameter of 6 mm (1/4").
Fasten tank (1) with screws (2) and connect hose (3)
to pneumatic unit.

Publicidad

Tabla de contenido
loading

Tabla de contenido