a) Remove the packing material from the machine, then
slide it off from the top (see fig. 1).
b) Identifying the machine
- once the packaging has been removed, check that
the machine which has been delivered is exactly the
machine ordered by verifying that the specifications
indicated on the invoice or on the shipping bill are
the same as those found on the specification plate.
c) Tool kit:
on opening the machine's packing you will find the
following equipment:
- this instruction manual plus the EU certificate of
conformity;
- 1 tube of Vaseline to be used for the machine's
maintenance (see paragraph h. page 24) and one
front seals for each bowl;
- 2 bags, each one containing a drip container and an
upper mixing device; proceed with the installation of
these two components for each individual tank
following the figures 22 and 23, found on page 25 of
this manual.
d) Insert the electricity cable for the illuminated cover in
the respective plug located on the cover itself.
e) Positioning the machine
- the main body of the machine must be well
ventilated. Installation of the machine near a heat
source should be avoided. A room temperature
between 15°C and 25°C is suggested (fig. 2).
The luminous covers can be positioned back to front
according to the needs of the operators.
Important
Any packing materials left within the reach of children may
become potential safety hazards.
4 - INSTALLATION
Fig. 1
Fig. 2
17