Minebea Intec IS X Serie Advertencias De Instalación Y Medidas De Seguridad página 8

Plataformas de pesaje digitales en atmósferas potencialmente explosivas
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 33
8
IS...-X Models
Below-Platform Weighing
– A port for a below-platform weighing hanger is located on the bottom of the platform
(models IS06BBE-SX, IS2CCE-SX, IS6CCE-HX, IS6CCE-SX and IS12CCE-SX only).
– Remove the cover plate from the bottom of the platform
– Attach the sample to a hook (e.g., a bent wire) suspended from the below-platform
weighing port. (If necessary, install a shield for protection against drafts.)
Setting up the weighing platform:
IS16EDE-HX, IS34EDE-HX, IS64EDE-SX
– Place the load plate on the weighing platform
Leveling the weighing platform using the level indicator:
Models IS16EDE-HX, IS34EDE-HX, IS64EDE-SX
At the place of installation, level the weighing platform using the leveling feet so that
the air bubble is centered within the circle on the level indicator. Check to ensure that
all four feet rest securely on the work surface.
– To raise the weighing platform, extend the leveling feet (turn clockwise).
– To lower the weighing platform, retract the leveling feet (turn counterclockwise).
Below-Platform Weighing
Models IS16EDE-HX, IS34EDE-HX, IS64EDE-SX
– A port for a below-platform weighing hanger is located on the bottom of the
weighing platform.
– Remove the cover plate from the bottom of the platform
– Attach the sample to a hook (e.g., a bent wire). Install the hook in the below-platform
weighing port. You can order the hook directly from Minebea Intec. (If necessary, install
a shield for protection against drafts.)

Publicidad

Tabla de contenido
loading

Tabla de contenido