420010331900 Maior P 150.1/200.1 AB
EN
NOZZLE
GPH
2,50
9,50
3,00
11,40
3,50
13,30
4,00
15,20
4,50
17,10
5,00
19,00
5,50
20,90
6,00
22,80
6,50
23,70
7,00
26,60
7,50
28,50
8,30
31,54
9,50
36,10
10,50
40,06
12,00
45,60
13,80
52,40
15,30
58,10
17,50
66,50
19,50
74,10
21,50
81,70
24,00
91,20
28,00
106,40
30,00
114,00
GPH
Use only the suitable box wrench provided for this operation to remove the nozzle, taking care to not damage the electrodes. Fit the
new nozzle with the same care.
Note: Always check the position of electrodes after having replaced the nozzle (see illustration). A wrong position could cause igni-
tion troubles.
SUNTEC AJ 6 C-C
5
SUNTEC
SUNTEC
4
2
NOZZLE FLOW RATE
DELAVAN B - MONARCH PLP
10
11
9,97
10,41
11,96
12,49
13,95
14,57
15,94
16,65
17,94
18,73
19,93
20,82
21,92
22,90
23,92
24,98
25,91
27,06
27,90
29,14
29,90
31,22
33,08
34,55
37,87
39,55
41,73
43,74
47,80
50,00
55,00
57,50
61,00
63,70
69,80
72,90
77,70
81,20
85,70
89,50
95,70
99,90
111,60
116,60
119,60
124,90
NOZZLE CLEANING AND REPLACEMENT
PRIMING AND ADJUSTMENT OF OIL PUMP
3
1
PUMP PRESSURE (bar)
12
13
10,83
11,24
13,00
13,49
15,17
15,74
17,33
17,99
19,50
20,24
21,67
22,48
23,83
24,73
26,00
26,98
28,17
29,23
30,33
31,48
32,50
33,73
35,97
37,32
41,17
42,72
45,41
47,20
52,00
54,00
59,80
62,10
66,30
68,80
75,80
78,70
84,50
87,70
93,20
96,70
104,00
107,90
121,30
125,90
130,00
134,90
OUTPUT kg/h
6 mm
SUNTEC J 7 C 1000
1
6
SUNTEC
SUNTEC
5
2
10
14
15
11,64
12,02
13,96
14,42
16,29
16,83
18,62
19,23
20,95
21,63
23,27
24,04
25,60
26,44
27,93
28,84
30,26
31,25
32,58
33,65
34,91
36,05
38,63
39,90
44,22
45,67
48,90
50,50
55,90
57,70
64,20
66,30
71,10
73,60
81,50
84,10
90,80
93,70
100,10
103,40
111,70
115,40
130,30
134,60
139,60
144,20
3,5 mm
4
6
3
16