EN
6.6 Priming of pumps
To prime the pump proceed as follows:
• Position bin below the pump to collect
leaking lubricant.
• Screw out the yellow transport locks (7.1)
from the metering device outlets.
• Close unneeded outlets of the metering
device with closure screws.
• Place filling connection of grease gun or
transfer pump onto filler fitting (2).
• Fill reservoir with lubricant
until the MAX marking (Fig. 19). To
do so, observe the notes contained in
chapter 4.8.
• Press key (3.1) to let the pump run until
lubricant leaks from the open outlets of
the metering device.
• Switch the pump off.
• Mount the primed lubricant lines to the
open outlets of the metering device and
then connect them to the lubrication
points.
38
• Remove lubricant collecting bin and dis-
pose of leaked lubricant in an ecologically
sound manner.
Rear view Fig. 8
The pump is now ready for operation with
the factory settings or can be adapted ac-
cordingly by changing the relevant param-
eters (programming).
Max
2
7.1
SKF MultiPoint Automatic
Lubricator TLMP series
3.1
min
6. Assembly
Front view Fig. 9
On
h