Error Code - GYS GYSPOT ARCPULL 200 Manual Del Usuario

Ocultar thumbs Ver también para GYSPOT ARCPULL 200:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 45
The gas protection cover must not be mounted on the ground pad when welding without gas pro-
tection.
• Put the pad (equipped with its cover) at the end of the earth rods and
screw in the 2 clamping screws. It is recommended to place the pad
with the clamping screws pointing down to the bottom of the gun to
keep the positioning markings clearly visible.
Note: The use of the gas protective pad and earth rods is not necessary
when welding a pull ring.
ERROR MESSAGE, ANOMALIES, CAUSES, SOLUTIONS
This device integrates a default management system. In the event of a default, error messages may be displayed.

Error code

Generator thermal
DEFAUT THERM I QUE
DEFAUT SECTEUR
TOUCHE APPUYEE
Communication fault
DEFAUT COM .
Gun thermal protec-
DEFAUT THERM I QUE
DEFAUT M OTEUR
All operations requiring the removal of the machine's cover and checking the electrical systems must be done by a
qualified technician.
GYSPOT ARCPULL 200
Meaning
Maximum duty cycle
protection
Mains power is out of
Mains voltage
range or one phase is
default.
A key on the keypad is
Keypad fault
pushed when the machine
Communication between
the gun and the power
with the gun
source is not working.
Maximum duty cycle
tion.
Gun mechanism is bloc-
Gun motor fault.
Causes
Wait for the indicator to turn off before
reached.
ked by a qualified person. The voltage
between 100V and 127Vac on a 110V sup-
missing.
ply network or between 200V and 265Vac
Ask a qualified person to check the key-
is switched on.
Reconnect the gun and switch the ma-
chine back on. If the fault remains, ask a
qualified person to check the product.
Wait for the indicator to turn off before
reached.
Reconnect the gun and switch the ma-
chine back on. If the fault remains, ask a
ked.
qualified person to check the product.
Positioning
marking
Clamping screw
Solutions
resuming welding operations.
Have your electrical installation chec-
between phase and neutral must be
on a 230Vac supply network.
pad.
resuming welding operations.
EN
29

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

057470

Tabla de contenido