Installation Of The Ceiling Cover - Emerson AIRA ECO Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Installation of the Ceiling Cover

6.1
Screw the two threaded studs (supplied) into the tapped
holes in the hanger bracket (Figure 18)
6.2
Lift the ceiling cover up to the threaded studs and turn until
studs protrude through the holes in the ceiling cover
(Figure 19).
Secure the ceiling cover in place by sliding lockwashers
over the threaded studs and installing the two knurled
knobs (supplied) (Figure 19).
Tighten the knurled knobs securely until the ceiling cover
fits snugly against the ceiling and the hole in the ceiling
cover is clear of the downrod (Figure 19).
WARNING
!
To avoid possible fire or shock, make sure that the
electrical wires are completely inside the outlet box and
not pinched between the ceiling cover and the ceiling.
Figure 18
Figure 19
12
HANGER
BRACKET
THREADED
STUD (2)
CEILING
COVER
THREADED
STUD (2)
LOCKWASHER (2)
KNURLED
KNOB (2)
E.T.L. Model No.: CF985

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Cf985bs00Cf985orb00

Tabla de contenido