Installation Of Ceiling Cover - Emerson ASHLAND CF717AP02 El Manual Del Propietario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9.1
Remove the Left Screw and Lockwasher from each side
of the Hanger Bracket (Figure 18) and loosen the other
Two Screws.
NOTE: When installing the ceiling fan using the
close-to-the-ceiling method, carefully lift the fan
assembly from the hook on the hanger bracket and
proceed as follows.
9.2
Lift the Ceiling Cover up to the Hanger Bracket. Engage
the Slots in the Ceiling Cover with the loosened Screws
in the Bracket and turn the Cover counterclockwise
(Figure 19). Be sure that the Lockwashers are between
the Screw Heads and the Ceiling Cover.
Install the other Two Screws and Lockwashers; tighten
all Screws securely
WARNING
!
To avoid possible fire or shock, make sure that the
electrical wires are completely inside the outlet box
and not pinched between the ceiling cover and the
ceiling.

9. Installation of Ceiling Cover

Figure 18
INSTALL SCREW
AND WASHER
Figure 19
Please contact 1-800-654-3545 for further assistance
13
LOOSEN
THIS
SCREW
REMOVE THIS
SCREW AND
LOCKWASHER
TIGHTEN
SCREW
CEILING
COVER
emersonfans.com
ETL Model No.: CF717-2

Publicidad

Tabla de contenido
loading

Tabla de contenido