ceed to joining up the other sec-
tions until the body is completed.
– replace the tie-rods in their origi-
nal position;
– replace the two lower front and
upper panels;
– install the smoke chamber and
the flange as in figure 6/a.
NOTE: before proceeding to con-
nect the system, test the boiler
block with a water pressure of 7.5
bar and fill in the "testing certifica-
te" completely.
2.6
FITTING THE CASING
The casing and the control panel
are supplied in separate cardboard
packages. The housing package also
contains the boiler documents and
the glass wool for insulating the cast
Sonda termostato sicurezza
Safety thermostat probe
8
7
11
10
11
2
5
KEY
1 Pin
2 Flange ø 35/87
3 Biconical nipples
4 Staybolt L. 900 + staybolt L. 980
5 Flange ø 50/87
6 Stub
7 Thrust bearing
8 Nut
9 Tightening wrench
1
6
12
3
4
Fig. 7
1
9
Fig. 8
45