Installation (continued)
4
Installing the 1-2- asy
Connect™
□
Route the junction box wires through the large
hole in the 1-2- asy Connect™ (D).
□
Place the 1-2- asy Connect™ (D) against the
junction box.
□
When mounting to a wall, the "UP" arrow
must point upward.
□
When mounting to an eave, the "UP" arrow
must point toward the building.
□
Insert the small mounting bolt (FF) through the
1-2- asy Connect™ (D) hole located below
the threaded hole, and thread it into the center
hole of the mounting bracket (GG). Tighten the
bolt (FF) securely.
□
Firmly pull on the 1-2- asy Connect™ to verify
it is securely attached to the mounting bracket.
FF
6
Mounting the light fixture
NOTICE: The two pins on the rear of the light fixture must be
inserted into the terminal block for the light to work.
□
Align the bottom edge of the light fixture (B) with
the bottom edge of the 1-2- asy Connect™ (D)
and tilt the light fixture (B) toward the
1-2- asy Connect™ (D). Ensure the light fixture
(B) is centered on the 1-2- asy Connect™ (D).
□
Tighten the large mounting bolt (EE) securely
through the center of the 1-2- asy Connect™
(D). Do not overtighten.
□
Push the rubber plug (AA) firmly into the
mounting bolt hole on the light fixture (B).
5
□
GG
T
N
O
R
F
D
6
Making the electrical
connections
Insert the junction box wires into the side of
the terminal block and around the ground
screw. Tighten terminal block screws using
the mini-screwdriver (HH) and ground screw to
secure the wires.
□
Insert the white wire from the junction box
into the terminal marked "N (White)".
□
Insert the black wire from the junction box
into the terminal marked "L (Black)".
□
Connect the bare or green ground wire
from the junction box to the ground screw
(marked with "GND").
UP/Haut/Arriba
GND
Terre
Tierra
T
N
O
R
F
B
AA
D
N (White/
Blanc/Blanco)
L (Black/
Noir/Negro)
D
EE