Maintenance; Safety Warnings For Maintenance; Cleaning - Ravelli Rc 120 Touch steel Manual De Uso Y Mantenimiento

Ocultar thumbs Ver también para Rc 120 Touch steel:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 234

MAINTENANCE

Safety warnings for maintenance

Maintenance of the stove must be performed at least once a year and should be planned in advance with the Technical
Assistance Service.
In some conditions, such as turning the stove on and off or inappropriate use, the combustion products can contain small
soot particles that build up in the smoke evacuation system. This can reduce the cross-section of the smoke duct and pose
a fire risk.The smoke evacuation system must be inspected and cleaned at least once a year.
The maintenance operations must be carried out when the stove is cold and with the electrical power supply disconnected.
Before completing any maintenance operation, adopt the following precautions:
Make sure that all stove parts are cold.
Make sure that the ashes are completely cold.
Always operate with equipment that is appropriate for maintenance.
When maintenance is finished, re-install all of the dis-assembled parts before restarting operation.
��
The quality of the pellet, the stove operating mode and combustion control can affect maintenance activity frequency.

Cleaning

��
Perform the cleaning operations so as to guarantee correct stove operation.
The table below lists the necessary cleaning operations required for correct stove operation.
��
In the first periods of use, carry out cleaning operations frequently to understand the right frequency of intervention, which
varies according to the installation, use, pellet used, etc.
Cleaning the ash drawer
The ash drawer must be cleaned every 30 days, (depending on the amount of time the stove is used and what type of pellet is
used).
To clean the ash drawer, proceed as follows:
1
Use and maintenance manual Rc-Rv 120 Touch steel
PARTS / FREQUENCY
Ash drawer
Glass
Scraper
Combustion chamber
Pellet tank
Extraction duct
2-3 DAYS
30 DAYS
2
Rev.1 11/03/2021
60/90 DAYS
Pag.48

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rv 120 touch steel

Tabla de contenido