Position Set Up - Suzuki 34200-96L2 Serie Manual De Instalación

Ocultar thumbs Ver también para 34200-96L2 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

(3) Position set up

• Fuel Tank Number of each engine position.
Engine Number
1 (Single)
2 (Dual)
3 (Triple)
4 (Quad)
*Fuel Tank Number
* 1st station only.
• If tank setting is performed with 1st station, tank information is shared with other gages.
• Main / Sub information of each engine position.
Main Information
Engine Speed
Speed / Fuel
Fuel
All Items
Sub Information
Total operating hours
Trip time
Trip distance
Battery voltage / Cooling
water temperature
Instantaneous fuel flow
Total instantaneous fuel
flow
Instantaneous fuel
economy
Average fuel economy
Total fuel used
Latitude / Longitude
26
CENTER
PORT
STBD
PORT
STBD
PORT
STBD
No 1, No 2
No 3, No 4
PORT
STBD
PORT
STBD
Engine Position
CENTER
C.PORT
Engine Position
CENTER
C.PORT
Engine Position
CENTER
C.PORT
NONE
C.STBD
C.STBD
NONE
C.STBD
NONE

Publicidad

Tabla de contenido
loading

Tabla de contenido