American Standard Mainstream Manual Del Usuario página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5
FINAL DOOR ADJUSTMENT
• In this step, you'll need following parts: [3] x8, [4] x8, [5] x8
• In this step, you'll need the following tools: F, K, J
5a. Now that the door is in place it will be necessary to LEVEL and PLUMB the door evenly within the 2 Wall
Posts [8]. Place level on top of door and move door within Wall Posts until level. Also check that door is
plumb. Once door is level and plumb, drill Wall Post [8] at 4 locations (from inside shower) using 3.2 mm
drill, (ref illustration A). Ensure door does not move once level and plumb.
5b. Screw each drilled hole using 4 ST4x10 screws [3] and Back Screw Caps [5]. Do not use an electric
powered screw gun, only hand screwdriver or screw may strip.
5c. Place Screw Caps [4] over each screw and press firmly into place.
5d. Check that door level and plumb again. Once it's determined the door is in the correct position, drill
Wall Post [8] at 4 locations (from within shower area) using 3.2 mm drill, (ref illustration B). Ensure door
does not move once level and plumb.
5e. Screw each drilled hole using 4 ST4x10 screws [3] and Back Screw Caps [5]. Do not use an electric
powered screw gun, only hand screwdriver or screw may strip.
5e. Place Screw Caps [4] over each screw and press firmly into place.
5a
5b
[5]
[3]
Screw
ST4x10
5c
[4]
VIEW FROM INSIDE
5d
5e
[5]
[3]
Screw
ST4x10
5f
[4]

Publicidad

Tabla de contenido
loading

Tabla de contenido