Installing The Bagger Frame - Toro Z Master 4000 Manual Del Operador

Kit de ensacador
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5

Installing the Bagger Frame

Parts needed for this procedure:
1
Bag support
2
Lock-pin assembly
Procedure
1.
Arrange the bagger frame around the pivot pins
on the support bracket and rotate it forward
(Figure
11).
1. Pivot pin
Figure 11
2. Bagger frame
2.
Insert the lock pin through the bagger frame and
cross brace
Note:
You may need to loosen the hardware to
align the lock pin to the hole.
1. Hairpin cotter
3.
Use the hairpin cotter to secure the lock pin
(Figure
12).
4.
Tighten all loose hardware.
g341549
12
(Figure
12).
Figure 12
2. Lock pin
g038187

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

78463

Tabla de contenido