Application Of Burner To Boiler; Gas Train Assembly - baltur TBG 50LX PN Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

APPLICATION OF BURNER TO BOILER

HEAD UNIT ASSEMNLY
A) Adjust the position of connector flange 5 by loosening the
screws 6 so that the combustion head penetrates the advised
amount into the combustion chamber as recommended by the
genertor's manufacturer.
Following the drawing, connect the tube on the attachment on
the flange and fix with the screw
B) Position the seal insulation 3 on the tube unit inserting cord 2
between flange and seal.
C) Fasten the Combustion Head unit 4 to the boiler 1 by means
of the stud bolts, washers and the nuts provided 7.
Note: isolate completely, with suitalbe materia
the space
between the burner tube and
the hole on the refractory material inside the
boiler's shutter.

GAS TRAIN ASSEMBLY

There are different assembly possibilities 8, 8a, 9 of the valves
train as shown in the diagram alongside. Select the best position
according to the particular arrangement of the boiler room and
the gas piping's entry position.
N.B. In the case of very large valves e.g. DN65 or DN80,
make sure there is sufficient support
to prevent excessive stresses on the gas train connector.
ASSEMBLYOFVENTILATION SYSTEM
A) Position the half-hinge on the buner s croll in line
with those on the combustion head assembly.
B) Put the hinge pin 10 in the position considered
most suitable.
C) Connect the cables (switch on and ionisation) to the cor
responding electrodes, close the hinge, locking the burner by
means of screws 11.
Tube fixing screw
Combustion chamber
pressure detection point
Combustion chamber
pressure transmission tube
2 / 73
000608327_2007
Combustion chamber pressure
detection stiff tube
Cut in line with diffuser
E
N
G
L
I
S
H

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tbg 80lx pnTbg 110lx pnTbg 140lx pnTbg 200lx pn

Tabla de contenido