Application Of Burner To Boiler - baltur TBL 85P Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 71

APPLICATION OF BURNER TO BOILER

E
N
HEAD UNIT ASSEMNLY
A) Adjust the position of connector flange 5 by loosening the
G
screws 6 so that the combustion head penetrates the advised
amount into the combustion chamber as recommended by the
L
generator's manufacturer.
I
B) Position the seal insulation 3 on the tube unit inserting cord 2
S
between flange and seal.
H
C) Fasten the Combustion Head unit 4 to the boiler 1 by means
of the stud bolts, washers and the nuts provided 7.
Competely seal the space between the tube unit of the burner
!
and the hole in the refractory panel using suitable materials
to do so.
ASSEMBLYOFVENTILATION SYSTEM
A) Position the half-hinge on the burner scroll in line with those
on the combustion head assembly.
B) Put the hinge pin 10 in the position considered most suitable.
C) Connect the cable switch on to thecorresponding electrodes,
close the hinge, locking the burner by means of screws 11.
COMPLETING BURNER SETUP
1)Remove the protective yellow caps from the connectors benea-
th the combustion head and close to the solenoid valves.
2) Connect the 12 light oil pipes provided with the burner to their
corresponding connectors, making sure they are properly sea-
led.
8 / 20
0006081322_201101

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tbl 105pTbl 130pTbl 160pTbl 210pTbl 85p dacaTbl 105p daca ... Mostrar todo

Tabla de contenido