Descargar Imprimir esta página

Steelcase Answer Manual Del Usuario página 8

Almacenamiento inferior a conectores de viga para viga
Ocultar thumbs Ver también para Answer:

Publicidad

Idiomas disponibles

Idiomas disponibles

®
Installation for Recessed Back
Storage
NOTE: The storage top needs to be assembled
after the storage unit is connected to the beam.
NOTE: Storage units can be connected to the
beam with either one left hand or one right hand
bracket.
1.
Inventory and stage all lower storage units and
storage brackets.
2.
Place the bracket on its proper corner, gauge it to
the top, and mark the top "T" hole for a 1 High, or the
"1" hole for a 1.5 High, or the "2" hole for a 2 High.
3.
Gauge the bracket to the bottom of the unit and
mark the bottom "B" mounting hole.
4.
Remove the bracket and drill 1/8" diameter
pilot holes at the two (2) marked locations.
Only drill 1/4" deep.
2
3
Page 8 of 40
100117 Rev A

Publicidad

loading