Descargar Imprimir esta página

nVent RAYCHEM JBS-100-A Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

12
• Fasten stand to pipe with label facing
desired direction of box opening. Do
not pinch heating cable.
• Loop and tape extra heating cable
to pipe.
13
• Screw box onto stand until it stops. Do not overtighten.
15
• Insert cable tie through slots on stand and box, and tighten firmly to
prevent box rotation.
1 in (25 mm)
Pipe strap
Trim
CAUTION: To avoid pinching the heating cable, be sure
the cable is not under the pipe strap.
ATTENTION: Pour éviter de pincer le câble chauffant,
assurez-vous que le câble ne se trouve pas sous la
sangle du tuyau.
Note: For 1 in (25 mm)
and smaller pipes use
adapter (purchased
separately) and install
between stand and pipe.
JBS-SPA
adapter for
Glass cloth tape
small pipes
14
(Optional) To change direction of box opening:
• Loosen locknut using adjustable pliers.
• Lift box and rotate. Make sure tab on threaded piece fits into one of
the four notches in box.
• Tighten locknut.
Notch
Position
adapter
this side
up.
nVent.com/RAYCHEM | 7

Publicidad

loading

Este manual también es adecuado para:

Jbs-100-a6