Operation; Conveyor Start-Up - HYTROL HSS Manual De Instalación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

• Bed Installation
1. Attach beds together using splice angle shown on Figure 7A.
2. Use hardware from the table below. (Quantity is amount of parts for each
bed.)
Quantity
Description
14
3/8-16" x 1" Carriage Bolt
14
3/8-16" Large Flange Locknut
1
Support Angle - Internal Couple, 3" x 20"
BELT LACING
FIGURE 7B
(ENLACE DE LA
CORREA)
BELT
(CORREA)
FIGURE 7D
TAIL PULLEY
FIGURE 7E
(POLEA DE RETORNO)

OPERATION

• Conveyor Start-Up

Before conveyor is turned on, check for foreign objects that may have been
left inside conveyor during installation. These objects could cause serious
damage during start-up. After conveyor has been turned on and is operating,
check motors, reducers, and moving parts to make sure they are working
freely.
LACING
(ENLACE)
BELT INSTALLATION CENTER DRIVE
TAIL PULLEY
(POLEA DE RETORNO)
DRIVE
(ACCIONAMIENTO)
CENTER
(CENTRO)
BELT INSTALLATION END DRIVE
(ACCIONAMIENTO)
FIGURE 7A
Use Notch to Align Midpoint
of Splice Angle With End of Bed
(Use la muesca para alinear el punto
medio del ángulo de empalme con el
extremo de la cama de soporte)
FIGURE 7C
TAKE-UP ROLLER
(RODILLO DE
COMPENSACIÓN)
SNUB IDLER
(RODILLO DE ALINEACIÓN)
TAKE-UP ROLLER
(RODILLO DE
COMPENSACIÓN)
DRIVE
SNUB IDLER
(RODILLO DE
ALINEACIÓN)
CAUTION! Because of the many moving parts on the conveyor, all personnel in the area
of the conveyor need to be warned that the conveyor is about to be started.
7
1
2
TAIL PULLEY
TAIL PULLEY
(POLEA DE
(POLEA DE
SIDE "X"
RETORNO)
RETORNO)
(LADO "X")
FLOW
(FLUJO)
SIDE "Y"
BELT
(LADO "Y")
(CORREA)
TAIL PULLEY
(POLEA DE
RETORNO)
RETURN IDLER
(RODILLO DE
RETORNO)
TAIL PULLEY
(POLEA DE
RETORNO)
SNUB IDLER
(RODILLO DE
ALINEACIÓN)
END
(EXTREMO)

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido