Tank Installation Instructions - Parker Chelsea URP50 El Manual Del Propietario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Bulletin HY25-1793-M1/US
Installation

Tank Installation Instructions

When installing a Hydraulic Reservoir, always wear protective
clothing and safety glasses.
To help ensure that you have the best installation possible do
a dry fit by positioning the mounting base on the frame and
do the following:
■ Look down through the mounting base openings for
possible interference.
■ Position the reservoir to check for interference on all sides.
■ Look up through the frame rails, make sure that you have room
to route hoses without interfering with the driveshaft or other
existing components that may have movement.
1. Once you have positioned the mounting base for clearance,
position the angle brackets against the sides of the frame rails.
The drilled hole in the angle bracket should be positioned
against the bottom of the mounting base. NOTE: The top of
the angle bracket should be flush with the top of the frame
rails.
2. Mark the position of the angle bracket on the frame rail. You will
need to drill two holes per bracket to attach the angle bracket
to the frame rails. Use eight .500" diameter capscrews that are
grade 5 or better along with lock nuts to attach the angle brack-
ets to the frame. CAUTION: Before drilling any holes, make
sure there is adequate clearance on both sides.
Owner's Manual
URP50 Tank
See Detail
6
Parker Hannifin Corporation
Chelsea Products Division
Olive Branch, MS 38654 USA

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido