Parker Chelsea URP50 El Manual Del Propietario página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Bulletin HY25-1793-M1/US
Installation
Tank Installation Instructions
3. Place the rubber cushions on top of the four mounting brack-
ets. NOTE: The rubber cushion must be above the top of
the frame rails. Position the mounting base on top of the rub-
ber mounting pads and align the holes.
4. Use the .625" – 3.500" capscrews (7), .625" I.D.- 1.750" O.D.
washer (8), spring (11) and lock nuts (12) to attach the mount-
ing base to the angle brackets. Slide one washer on the cap
screw and install it through the mounting base, rubber pad and
angle brackets. From the bottom side install the spring, washer
and lock nut.
7
12
5. With all four angle brackets secured to the mounting base it is
time to tighten the lock nut until the compressed length of the
spring is 1.500". DO NOT completely compress the spring.
Owner's Manual
URP50 Tank
8
11
8
7
Parker Hannifin Corporation
Chelsea Products Division
Olive Branch, MS 38654 USA

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido