Electrical Connection; Important - Sime Estelle HE B4 INOX Manual Del Usuario

Ocultar thumbs Ver también para Estelle HE B4 INOX:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15
ensures constant and efficient
extraction of products generated by
combustion;
– to prevent the wind from creating
pressure zones around the chim-
ney top greater than the uplift
force of combustion gases, the
exhaust outlet should be at least
0.4 m higher than structures adja-
cent to the stack (including the
roof top) within 8 m;
– have a diameter that is not inferior
to that of the boiler union: square or
rectangular-section flues should
have an internal section 10%
greater than that of the boiler union;
– the useful section of the flue must
conform to the following formula:
P
S = K
√H
S resulting section in cm
K reduction coefficient for liquid
fuels:
– 0.045 for firewood
– 0.030 for coal
– 0.024 for light oil
– 0.016 for gas
P boiler input in kcal/h
KEY
IG
Main switch
TB Tank stat
R
Relay
TL
Limit stat
TS Safety stat
EI
Summer/Winter switch
TC Boiler stat
SPA Water pressure gauge triggered light
SA Power on light
PA Water switch
PI
C.H. pump
PB Tank pump
B
Direct Feeding Burner (not supplied)
38
H height of flue in meters, mea-
sured from the flame axis to the
top of the flue reduced by:
– 0.50 m for each change of
direction of the connection
union between boiler and flue;
– 1.00 m for each metre of
union itself.
2.5

ELECTRICAL CONNECTION

The boiler is fitted with an electricity
cable, and requires a a single-phase
power supply of 230V - 50Hz through
the main switch protected by fuses.
The room thermostat (required for
enhanced room temperature control)
should be installed as shown in fig. 6.
Connect the burner and system circu-
lation pump power cables supplied.
2
NOTE: Device must be connected to
an efficient earthing system. SIME
declines all responsibility for injury
caused to persons due to failure to
earth the boiler. Always turn off the
power supply before doing any work
on the electrical panel.
2.5. 1 RVA 43.222 climat controller
All functions of the boiler may be con-
trolled using the controller, optional
code 8096303, which is supplied with
an outdoor temperature probe (SE)
and a boiler immersion probe (SC). The
controller is installed in the control
panel in place of the relating cover (fig.
6). The controller is to be connected to
an additional series of low voltage con-
nectors for connection of the room
temperature control unit (the connec-
tors are supplied in a bag inside the
control panel).
The probe bulb of the external hot
water tank, if any, (SS) code 6277110,
must be inserted in the hot water tank
sheath, while the bulb of the boiler
probe (SC) must be inserted in the boi-
ler sheath. When assembling the out-
door temperature probe, follow the
instructions provided in the probe
package. Refer to fig. 5 for wiring
instructions.
IMPORTANT: To make sure that the
unit works properly, set the boiler con-
trol thermostat as high as it will go.
B1 Permanent Feeding Burner (not supplied)
TA Room stat
OP Timer programmer
C
Connectors for RVA 43.222 controller (black - red - brown)
UA Type QAA70 room temperature control unit (optional)
SE Outdoor temperature probe (optional)
SC Type QAZ21 boiler probe (optional)
SS Type QAZ21 hot water probe (optional)
NOTE: When connecting the room stat (TA) remove the bridge
between terminals 20-21. When connecting the timer pro-
grammer (OP) remove the bridge between terminals 30-31.
When connecting the RV 43.222 unit remove the bridge
between terminals 20-21 and remove the relay (R).
NOTE: The brown (capped off)
cable has to be exclusively used
in case of permanent feeding
burners (type B1).
Fig. 5

Publicidad

Tabla de contenido
loading

Tabla de contenido