SMA Solar Technology AG
13.
Damage to the assembly due to mechanical strain
If the assembly is excessively bent, solder contacts, components and conducting paths may
snap.
• Place the OCS assembly onto the spacers and carefully press it down in the middle
until the spacers snap into place.
• Tighten the spacer in the top part of the OCS assembly.
• If present, reconnect the data cables to the OCS assembly in accordance with the
assignment noted during removal. To do so, insert the conductors into the screw
terminals and retighten the screw terminal with a flat-blade screwdriver (blade width: 2
mm).
14. Connect the ribbon cable to the OCS assembly.
15. Depending on the version, connect the Power
Balancer cable either to the pin connector or the
screw terminal on the OCS assembly.
16. Connect the remaining cables:
Replacement Manual
7 Installing the new AC power controller assembly
NOTICE
AST-SMC9-11-RM-xx-10
19