Descargar Imprimir esta página

Raychem JBS-100-A Instrucciones De Instalación página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

2
JBS-100-A, A6 Installation Instructions
Heating cable types
Inner jacket
Conductive core
Bus wire
BTV-CR, BTV-CT, QTVR-CT
1
• Allow approximately 24 in (60 cm) of heating cable for instal-
lation. For VPL, cut cable 12 in (30 cm) from bus indentation.
• Cut off heating cable end at about 45° for easier insertion.
12"
(30 cm)
24"
(60 cm)
3
• Lightly score outer jacket around and down as shown.
• Bend heating cable to break jacket at score, then peel
off jacket.
Do not cut braid.
Outer
jacket
Braid
Spacer
Bus wire
XTV-CT, KTV-CT
45°
Indentation (bus wire
connection on VPL
heating cables only).
7 1/2"
(190 mm)
Outer jacket
Braid
Inner jacket
Conductive fiber
Insulated bus wire
VPL-CT
2
• Optional: If stand is to be installed
on bottom side of pipe, knock out
drain hole prior to inserting cable.
• With label on stand facing desired
direction of box opening, push 18
in (45 cm) of heating cable through
stand. Use cable lubricant if needed.
• Square off cable end with 90° cut.
4
BTV and QTVR
XTV and KTV
Braid
Inner jacket
Heating element
Bus wire connection
Clear jacket
18"
(45 cm)
Label on stand
indicates
Drain hole
direction of
box opening.
• Do not attach
stand to pipe
until step 12.
Go to Step 5a
Go to Step 5b
Go to Step 5c
VPL
Outer
jacket

Publicidad

loading

Este manual también es adecuado para:

Jbs-100-a6