2
JBS-100-A, A6 Installation Instructions
Heating cable types
Inner jacket
Conductive core
Bus wire
BTV-CR, BTV-CT, QTVR-CT
1
• Allow approximately 24 in (60 cm) of heating cable for instal-
lation. For VPL, cut cable 12 in (30 cm) from bus indentation.
• Cut off heating cable end at about 45° for easier insertion.
12"
(30 cm)
24"
(60 cm)
3
• Lightly score outer jacket around and down as shown.
• Bend heating cable to break jacket at score, then peel
off jacket.
Do not cut braid.
Outer
jacket
Braid
Spacer
Bus wire
XTV-CT, KTV-CT
45°
Indentation (bus wire
connection on VPL
heating cables only).
7 1/2"
(190 mm)
Outer jacket
Braid
Inner jacket
Conductive fiber
Insulated bus wire
VPL-CT
2
• Optional: If stand is to be installed
on bottom side of pipe, knock out
drain hole prior to inserting cable.
• With label on stand facing desired
direction of box opening, push 18
in (45 cm) of heating cable through
stand. Use cable lubricant if needed.
• Square off cable end with 90° cut.
4
BTV and QTVR
XTV and KTV
Braid
Inner jacket
Heating element
Bus wire connection
Clear jacket
18"
(45 cm)
Label on stand
indicates
Drain hole
direction of
box opening.
• Do not attach
stand to pipe
until step 12.
Go to Step 5a
Go to Step 5b
Go to Step 5c
VPL
Outer
jacket