8
JBS-100-A, A6 Installation Instructions
17
• Install conduit and fittings as shown.
To minimize loosening due to pipe
vibration, use flexible conduit.
• Pull in power and ground wires, strip
off 1/2 in (13 mm) of insulation and
terminate.
Power and ground wires
1/2"
(13 mm)
18
• Install lid.
• Apply insulation and cladding.
• Weather-seal the stand entry.
• Leave these instructions with the end user for
future reference.
Worldwide Headquarters
Tyco Thermal Controls
7433 Harwin Drive
Houston, TX 77036
USA
Tel: 800-545-6258
Tel: 650-216-1526
Fax: 800-527-5703
Fax: 650-474-7711
info@tycothermal.com
www.tycothermal.com
Tyco, BTV, QTVR, XTV, KTV, JBS and VPL are registered and/or unregistered trademarks of
Tyco Thermal Controls LLC or its affiliates.
All other trademarks are the property of their respective owners.
All information, including illustrations, is believed to be reliable. Users, however, should independently evaluate
Important:
the suitability of each product for their particular application. Tyco Thermal Controls makes no warranties as to the accuracy
or completeness of the information, and disclaims any liability regarding its use. Tyco Thermal Controls' only obliga-
tions are those in the Tyco Thermal Controls Standard Terms and Conditions of Sale for this product, and in no case will
Tyco Thermal Controls or its distributors be liable for any incidental, indirect, or consequential damages arising from the
sale, resale, use, or misuse of the product. Specifications are subject to change without notice. In addition, Tyco Thermal
Controls reserves the right to make changes–without notification to Buyer–to processing or materials that do not affect
compliance with any applicable specification.
3/4" locknut
Water tight
conduit seal
Conduit
Tyco Thermal Controls recommends
drain
the use of a conduit drain to prevent
water condensation build-up.
Weather seal
Make sure
conductors are
not exposed.