Descargar Imprimir esta página

Raychem JBS-100-A Instrucciones De Instalación página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

6
JBS-100-A, A6 Installation Instructions
12
• Fasten stand to pipe with label facing
desired direction of box opening. Do not
pinch heating cable.
• Loop and tape extra heating cable to pipe.
13
• Screw box onto stand until it stops. Do not overtighten.
15
• Insert cable tie through slots on stand and box, and
tighten firmly to prevent box rotation.
1" (25 mm)
Glass cloth tape
Pipe strap
Trim
Note: For 1" (25 mm)
and smaller pipes use
adapter (purchased
separately) and install
between stand and pipe.
JBS-SPA
adapter for
small pipes
14
(Optional) To change direction of box opening:
• Loosen locknut using adjustable pliers.
• Lift box and rotate. Make sure tab
on threaded piece fits into one
of the four notches in box.
• Tighten locknut.
Notch
Position
adapter
this side
up.

Publicidad

loading

Este manual también es adecuado para:

Jbs-100-a6