5a
BTV and QTVR
• Push braid back to create a pucker.
• At pucker use a screwdriver to
open braid.
• Bend heating cable and work it
through opening in braid.
• Lightly score inner
jacket around and
down as shown.
• Peel off inner jacket.
• Notch core.
• Peel bus wire from core.
• Score core between bus
wires at inner jacket.
• Bend and snap core.
• Peel core from bus wire.
• Remove any remaining
core material from bus wires.
• Pull braid tight to
make pigtail.
6 1/2"
(165 mm)
1/4"
(5 mm)
Go to Step 6
JBS-100-A, A6 Installation Instructions
5b
XTV and KTV
• Push braid back to create a pucker.
• At pucker use a screwdriver to
open braid.
• Bend heating cable and work it
through opening in braid.
• Lightly score inner
jacket around and
down as shown.
• Peel off inner jacket.
• Cut and remove
all fiber strands.
• Score and remove
center spacer.
• Remove any remaining
fiber material from bus
wires.
• Pull braid tight to
make pigtail.
3
6 1/2"
(165 mm)
Go to Step 6