Descargar Imprimir esta página

Raychem JBS-100-A Instrucciones De Instalación página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

6
• Mark the jacket
as shown.
8
• Push core sealer onto
the heating cable to the
mark made in step 6.
Note: Extra force may be
required for larger cables
or at lower temperatures.
10
• Slip the green/yellow tube onto the braid.
Heat-shrinking is not required.
• Trim bus wires and braid.
1/2"
(13 mm)
(13 mm)
5/8"
(15 mm)
Make sure the bus
wires do not kink,
bunch, or crossover.
1/2"
JBS-100-A, A6 Installation Instructions
7
CAUTION: Health Hazard.
Wash hands after contact with sealant. Consult material
safety data sheet VEN0033.
• If needed, re-twist and straighten bus wires, then
insert into the guide tubes as shown.
Make sure all strands
go into the tubes.
9
• Remove the guide tubes and
dispose of them in a plastic bag.
11
• Pull heating cable back into stand so 1 in (25 mm) is
exposed as shown. Use cable lubricant if needed.
5
Tubes
1" (25 mm)

Publicidad

loading

Este manual también es adecuado para:

Jbs-100-a6