Install The Wire Ropes; Connection Of Operating Unit; Installing Pneumatic System - Bosch VLH 4x45 Manual Del Usuario

Tabla de contenido

Publicidad

3.7.6

Install the wire ropes

1. Push the threaded end piece of the wire ropes from
below into the head plate of the column.
2. Fasten the threaded end piece from above with a nut
and washer.
3. Secure the threaded end piece with an additional
lock nut.
Fig. 17:
Components in column
1 Column end plate
2 Threaded end piece
3 Wire rope
4 Locking bar
5 Snap latch
6 Safety bar
4. Install the wire ropes for the other three columns in
the same manner.
i
The locking bars are pre-fitted in the columns at the
factory.
Robert Bosch GmbH
Installation | VLH 4x45 | 39
3.8

Connection of operating unit

!
The power cord must be connected by a qualified
electrician as per VDE 0100.
1. Open the operating unit at the control column.
2. Connect the power cord in the operating unit
in accordance with the circuit diagram (refer to
Section 6).
i
Circuit diagram
3. Check the protective conductors.
3.9

Installing pneumatic system

1. Connect up the pneumatic hoses inside the lifting
platform on the basis of the pneumatics diagram
(refer to Section 7).
2. Connect the compressed air inlet of the lifting
platform to the user's compressed air supply.
i
The compressed air inlet is located at the top of the
hydraulic unit (connection to 3/2-way valve).
3. Set the user's compressed air service unit to an
outlet pressure of 8 bar.
en
|
1 689 978 561
2017-07-14

Publicidad

Tabla de contenido
loading

Tabla de contenido