Commissioning The Flow Control - Abicor Binzel ABICOOLER 1300 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 Commissioning

6.2.4 Commissioning the flow control

A flow control is integrated as standard in the device, however, it must be connected via the supplied flow
control line. The available connection is suitable only for two-step operation. If a flow control is used, the
device switches off the welding current if the coolant level is low and the torch button is pressed. The flow
control is pre-set to 0.6–0.8 l/min.
 13.1 Connecting diagram for flow control auf Seite EN-22
EN - 14
ABICOOLER 1300
Open the device connection housing.
1
Disassemble one button line.
2
Disassemble the cap from the connection housing.
3
Guide the flow control with the line ends through
4
the opening.
Pull the heat-shrinking tube over both line ends
5
and connect the button line to the flow control.

Publicidad

Tabla de contenido
loading

Tabla de contenido